LINE Name Country City Regional Rail
Line 22 CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
78.6 48.5 62% 20 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
63930.0 CNY 0.24 2019 15228.7 193.7 Plan
REFERENCE http://www.tzxm.gov.cn/flfg/law/201912/t20191220_12825.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Beijing city page.