LINE Name Country City Regional Rail
Line 3 Phase 1+2 CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2021 37.4 20.8 55% 27 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
41500.0 CNY 0.26 2015 10720.7 286.7 Plan
REFERENCE http://www.gov.cn/xinwen/2018-02/18/content_5267552.htm; https://zh.m.wikisource.org/zh-hans/%E5%8C%97%E4%BA%AC%E5%B8%82%E5%9F%8E%E5%B8%82%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A%E7%AC%AC%E4%BA%8C%E6%9C%9F%E5%BB%BA%E8%AE%BE%E8%A7%84%E5%88%92%EF%BC%882015%EF%BD%9E2021%E5%B9%B4%EF%BC%89
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.