LINE Name Country City Regional Rail
Line 8 Northern Extension CN Beijing No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2013 6.33 4.65 73% 3 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3212.2 CNY 0.28 2011 911.5 144.0 Media
REFERENCE https://max.book118.com/html/2017/1209/143431974.shtm
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Beijing city page.