LINE | Name | Country | City | Regional Rail | |||
Line 8 Phase 1 for Olympics | CN | Beijing | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2005 | 2008 | 4.53 | 4.53 | 100% | 4 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
2420.0 | CNY | 0.35 | 2005 | 851.2 | 188.0 | Media | |
REFERENCE | https://www.360kuai.com/pc/9fb76b182add530db?cota=4&kuai_so=1&tj_url=so_rec&sign=360_7bc3b157; http://itdzs.org/OnLineMagazine/PDFView.aspx?ID=4 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Beijing city page. |