LINE Name Country City Regional Rail
U2 to Pankow DE Berlin No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1997 2000 0.8 0.8 100% 1 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
54.0* EUR 1.3 1998 70.2 87.8 Media
REFERENCE https://www.berliner-zeitung.de/endspurt-auf-der-baustelle-die-strecke-von-vinetastrasse-nach-bahnhof-pankow-wird-puenktlich-fertig-und-billiger-u-bahn-linie-2-ab-sonnabend-sind-die-pankower-am-zug-li.33430
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Converted from 105 million DM.
Go to Berlin city page.