LINE | Name | Country | City | Regional Rail | |||
U5-U55 connection | DE | Berlin | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2010 | 2020 | 2.2 | 2.2 | 100% | 3 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
525.0 | EUR | 1.3 | 2015 | 682.5 | 310.2 | Plan | |
REFERENCE | https://www.projekt-u5.de/de/die-neue-u5/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||