LINE | Name | Country | City | Regional Rail | |||
U8 to Wittenau | DE | Berlin | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
1985 | 1994 | 3.6* | 3.6 | 100% | 4 | Wiki | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
520.0** | EUR | 1.3 | 2020 | 676.0 | 187.8 | Trade | |
REFERENCE | https://signalarchiv.de/Meldungen/10003834 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Source says 4.2 km but this includes tail tracks. ** Converted (and, uniquely for this table, inflation-adjusted) from 600 million DM. |
||||||