LINE Name Country City Regional Rail
Line 7 Phase 1 CN Changchun No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2025 22.5 22.5 100% 19 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
15583.0 CNY 0.24 2018 3706.7 164.7 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/tz/201812/W020190905514226164270.pdf; https://baike.baidu.com/item/%E9%95%BF%E6%98%A5%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A7%E5%8F%B7%E7%BA%BF/17545289
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.