LINE Name Country City Regional Rail
Line 2 West Extension Phase 2 CN Changsha No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2021 13.99 13.78 98% 11 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
11138.0 CNY 0.24 2020 2653.1 189.6 Plan
REFERENCE https://www.ndrc.gov.cn/xxgk/zcfb/ghwb/201703/W020190905497919692262.pdf; http://www.rail-transit.com/shiping/show.php?itemid=851
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.