LINE Name Country City Regional Rail
Line 5 BD Dhaka No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2028 19.6* 14.0 70% 14 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
412380.0 BDT 0.03 2024 13196.2 673.3 Media
REFERENCE https://bdnews24.com/economy/2019/10/15/govt-approves-two-more-metro-rail-projects-worth-tk-938bn
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* This source says 20 km: https://www.thedailystar.net/frontpage/news/dhaka-metro-rail-two-more-lines-cost-tk-93800cr-1813843
Go to Dhaka city page.