LINE Name Country City Regional Rail
Nanakuma Line extension JP Fukuoka No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2014 2022 1.6 1.6 100% 2 Wiki
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
58700.0 JPY 0.01 2018 587.0 366.9 Media
REFERENCE https://www.fukuoka-now.com/en/news/nanakuma-subway-line-extension-delayed/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Fukuoka city page.