LINE Name Country City Regional Rail
U4 to Dannerallee DE Hamburg No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2.6 2.6 100% 3 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
511.0 EUR 1.3 2019 664.3 255.5 Media
REFERENCE https://www.nahverkehrhamburg.de/u4-kann-verlaengert-werden-planfeststellungsbeschluss-ist-da-14090/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.