LINE Name Country City Regional Rail
Line 2 VN Hanoi No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2020 11.5 8.5 74% 12 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
19555000.0* VND 0.0 2015 2463.9 214.3 Media
REFERENCE http://saigondautu.com.vn/chu-diem-su-kien/5-du-an-doi-von-khung-61311.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Source is ex medio, but ex post trade press confirms the cost in exchange rate dollars: https://www.railjournal.com/passenger/metros/hanoi-completes-construction-of-first-metro-line/