LINE | Name | Country | City | Regional Rail | |||
Line 5 Phase 1 | CN | Hefei | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2016 | 2020 | 40.3 | 40.3 | 100% | 34 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
28424.0 | CNY | 0.27 | 2014 | 7561.6 | 187.6 | Plan | |
REFERENCE | https://www.ndrc.gov.cn/xxgk/zcfb/tz/201412/W020190905507203840468.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||