LINE Name Country City Regional Rail
Line 5 first phase VN Ho Chi Minh City No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2025 2029 8.9 7.5 84% 7 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
41600000.0* VND 0.0 2027 5241.6 588.9 Media
REFERENCE https://saigoneer.com/saigon-news/12943-saigon-starts-seeking-investors-for-metro-line-5
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* See also https://www.vir.com.vn/pre-feasibility-report-of-17-billion-metro-line-5-in-ho-chi-minh-city-awaits-approval-76334.html, which mentions a very close cost in exchange-rate US dollars.
Go to Ho Chi Minh City city page.