LINE Name Country City Regional Rail
Airport Railway Numbers changed from a duplicate on this and the subsequent 3 lines (note color in table). Hong Kong No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1994 1998 34.0 8.0 23% 9 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
34000.0 HKD 0.19 1996 6361.4 187.1 Plan
REFERENCE https://www.info.gov.hk/archive/napco/cost.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.