LINE Name Country City Regional Rail
Eastern Harbour Crossing HK Hong Kong No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1986 1989 4.6 4.6 100% 1 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1254.0 HKD 0.38 1987 472.5 102.7 Plan
REFERENCE https://mmis.hkpl.gov.hk///c/portal/cover?c=QF757YsWv59%2F9WIUSQ5l77yBOL%2Bgwk13#.YW423bEbO3o.link
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Hong Kong city page.