LINE Name Country City Regional Rail
Modified Initial System HK Hong Kong No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1975 1980 15.6 12.8 82% 15 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
5637.0 HKD 0.92 1977 5161.8 330.9 Plan
REFERENCE https://mmis.hkpl.gov.hk///c/portal/cover?c=QF757YsWv59%2F9WIUSQ5l76Vd0tr1CR%2F%2F#.YW2ctNha4E8.link
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.