LINE Name Country City Regional Rail
HART US Honolulu No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2026 32.0 0.0 0% 21 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
9900.0 USD 1.0 2017 9900.0 309.4 Trade
REFERENCE https://www.railjournal.com/passenger/metros/costs-continue-to-rise-on-honolulus-much-delayed-metro-project/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.