LINE | Name | Country | City | Regional Rail | |||
M1 (Phase 2) | TR | Izmir | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2005 | 2014 | 5.35 | 5.35 | 100% | 6 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
252.0 | TRY | 1.1 | 2010 | 277.2 | 51.8 | Plan | |
REFERENCE | https://www.uab.gov.tr/uploads/pages/kutuphane/d38e678334e19c8.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Izmir city page. |