LINE Name Country City Regional Rail
M1 Phase 2 TR Izmir No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2005 2014 5.35 5.35 100% 6 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
252.0 TRY 1.1 2010 277.2 51.8 Media
REFERENCE https://www.uab.gov.tr/uploads/pages/kutuphane/d38e678334e19c8.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.