LINE Name Country City Regional Rail
M1 Phase 3 TR Izmir No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2010 2012 2.25 2.25 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
106.0 TRY 1.0 2011 106 47.1 Media
REFERENCE https://www.uab.gov.tr/uploads/pages/kutuphane/d38e678334e19c8.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.