LINE Name Country City Regional Rail
M1 (Phase 3) TR Izmir No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2010 2012 2.25 2.25 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
106.0 TRY 1.0 2011 106.0 47.1 Plan
REFERENCE https://www.uab.gov.tr/uploads/pages/kutuphane/d38e678334e19c8.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Izmir city page.