LINE | Name | Country | City | Regional Rail | |||
Orange Line | PK | Lahore | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2015 | 2020 | 27.1 | 1.6 | 6% | 26 | Wiki | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
183000.0* | PKR | 0.03 | 2017 | 6039.0 | 222.8 | Media | |
REFERENCE | https://dailytimes.com.pk/470024/punjab-drops-plan-to-connect-orange-line-train-with-metro-bus-railway-station/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * The project has a cost figure in dollars (paid by China) and an additional cost in rupees (paid domestically). The dollar cost is about $1.5b, agreed when the official rate was 1:100, hence the claim of 150b PKR in https://www.dawn.com/news/1436724. The rupee cost is now 33b. |
||||||