LINE Name Country City Regional Rail
Crossrail UK London Yes
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2009 2021 21.0 21.0 100% 8 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
13328.0 GBP 1.4 2015 18659.2 888.5 FOI
REFERENCE