LINE | Name | Country | City | Regional Rail | |||
Purple Phase 1 | US | Los Angeles | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2014 | 2024 | 6.3 | 6.3 | 100% | 3 | Media | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
2,800.0* | USD | 1.0 | 2018 | 3,021.5 | 479.6 | Media | |
REFERENCE | https://la.streetsblog.org/2018/04/25/metro-celebrates-purple-line-extension-1-tunnel-machines-set-to-start-in-august/ | ||||||
NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * There is a cost overrun of unidentified size. https://la.streetsblog.org/2020/06/09/metro-purple-line-extension-section-1-difficult-tunnelling-resulting-in-cost-overruns/ |
||||||
Go to Los Angeles city page. |