LINE Name Country City Regional Rail
Purple Phase 2 US Los Angeles No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2018 2026 4.2 4.2 100% 2 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
2,400.0 USD 1.0 2021 2,400.0 571.4 Trade
REFERENCE https://www.railjournal.com/in_depth/transit-projects-fly-in-the-city-of-angels
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.