LINE | Name | Country | City | Regional Rail | |||
Line B to Hospital-Sud | FR | Lyon | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2017 | 2023 | 2.5 | 2.5 | 100% | 2 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
394.0* | EUR | 1.3 | 2020 | 512.2 | 204.9 | Plan | |
REFERENCE | http://www.oullins.fr/territoire-d-avenir/prolongement-du-metro-b-382.html | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * This is ex ante, but media articles through early 2020 do not mention cost overruns, and one mentions an average cost per km in line with the original budget: https://www.brefeco.com/actualite/amenagement-infrastructures/les-pistes-du-sytral-pour-les-transports-en-commun-du-futur |
||||||
Go to Lyon city page. |