LINE Name Country City Regional Rail
Line B to Hospital-Sud FR Lyon No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2023 2.5 2.5 100% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
394.0* EUR 1.3 2020 512.2 204.9 Plan
REFERENCE http://www.oullins.fr/territoire-d-avenir/prolongement-du-metro-b-382.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* This is ex ante, but media articles through early 2020 do not mention cost overruns, and one mentions an average cost per km in line with the original budget: https://www.brefeco.com/actualite/amenagement-infrastructures/les-pistes-du-sytral-pour-les-transports-en-commun-du-futur