LINE Name Country City Regional Rail
1999-2003 program ES Madrid No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
1999 2003 75.0 58.0 77% 39 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3157.0* EUR 1.25 2001 3946.2 52.6 Trade
REFERENCE https://tunnelbuilder.com/metrosur/edition2pdf/page2.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Including rolling stock.
Go to Madrid city page.