LINE Name Country City Regional Rail
Line 7 PH Manila No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2015 2021 22.8 3.4 15% 14 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
69300.0 PHP 0.06 2018 3811.5 167.2 Trade
REFERENCE https://www.railwaygazette.com/news/single-view/view/manila-metro-line-7-breaks-ground.html