LINE | Name | Country | City | Regional Rail | |||
Line 4 | IT | Milan | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2015 | 2023 | 15.2 | 15.2 | 100% | 21 | Wiki | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1696.7* | EUR | 1.3 | 2019 | 2205.7 | 145.1 | Plan | |
REFERENCE | https://www.metro4milano.it/wordpress/wp-content/uploads/2020/04/Quadro-Economico-_-Atto-Integrativo-n.1-alla-Convenzione-di-concessione_-allegato-13.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Reference says 1,943.8 but includes rolling stock, which per an older report before a cost overrun was 247.2: https://www.metro4milano.it/wordpress/wp-content/uploads/2016/09/2016.05.27-CdM-Integraz-relaz-tecnico-economica-Allegati.xlsx.pdf |
||||||
Go to Milan city page. |