LINE Name Country City Regional Rail
Line 3 IN Mumbai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2022 33.5 33.5 100% 27 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
320000.0 INR 0.05 2019 15040 449.0 Trade
REFERENCE https://housing.com/news/mumbai-metro-line-3-everything-you-need-to-know/