LINE Name Country City Regional Rail
Line 3 IN Mumbai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2022 33.5 33.5 100% 27 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
320000.0* INR 0.05 2019 15040.0 449.0 Trade
REFERENCE https://housing.com/news/mumbai-metro-line-3-everything-you-need-to-know/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* See https://www.metrorailnews.in/tunneling-work-on-mumbai-metro-line-3-likely-to-complete-by-2021/