LINE | Name | Country | City | Regional Rail | |||
Line 4A | IN | Mumbai | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2019 | 2022 | 2.7 | 0.0 | 0% | 2 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
7860.0 | INR | 0.05 | 2017 | 377.3 | 139.7 | Plan | |
REFERENCE | https://mmrda.maharashtra.gov.in/documents/10180/9283015/Metro+Line+4A/da25997a-6844-4c74-b4bd-9538285c9471 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Mumbai city page. |