LINE Name Country City Regional Rail
Line 4A IN Mumbai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2022 2.7 0.0 0% 2 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
7860.0 INR 0.05 2017 377.3 139.7 Plan
REFERENCE https://mmrda.maharashtra.gov.in/documents/10180/9283015/Metro+Line+4A/da25997a-6844-4c74-b4bd-9538285c9471
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.