LINE Name Country City Regional Rail
Line 2 Eastern Extension CN Nanning No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2021 6.5 6.5 100% 4 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
4898.0 CNY 0.24 2017 1170.7 180.1 Media
REFERENCE http://www.nngdjt.com/html/4061/8670.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.