LINE Name Country City Regional Rail
Second Avenue Phase 2 US New York No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2029 2.6 2.6 100% 3 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
6300.0* USD 1.0 2024 6300.0 2423.1 Trade
REFERENCE https://twitter.com/andrewsiff4NY/status/1463249486386540550
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* https://www.masstransitmag.com/rail/infrastructure/blog/21147543/oped-why-the-ny-mta-will-have-to-postpone-69billion-second-avenue-subway-phase-2-to-the-next-fiveyear-capital-program and https://www.railjournal.com/regions/north-america/major-rail-projects-included-in-new-york-governors-2021-infrastructure-agenda/ both say $6 billion.
Go to New York city page.