LINE Name Country City Regional Rail
Line 2 extension RU Nizhniy Novgorod No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2015 2018 2.5* 2.5 100% 1 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
11,000.0** RUB 0.04 2016 509.2 203.7 Trade
REFERENCE https://www.metro-report.com/analysis/single-news/view/the-winners-and-losers-of-russian-metros.html
NOTES The ‘Real cost’ values have been adjusted for inflation and PPP.
Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* https://www.railwaygazette.com/projects-and-planning/nizhny-novgorod-world-cup-metro-extension-inaugurated/46612.article says 2.2 km.
** https://www.railwaygazette.com/projects-and-planning/nizhny-novgorod-world-cup-metro-extension-inaugurated/46612.article says 10,700.
Go to Nizhniy Novgorod city page.