LINE | Name | Country | City | Regional Rail | |||
Line 3 | PA | Panama City | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2020 | 2024* | 26.7** | 0.0 | 0% | 14 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
2507.0*** | USD | 2.08 | 2020 | 5214.6 | 195.3 | Trade | |
REFERENCE | https://www.railwaypro.com/wp/south-korean-consortium-to-build-panama-metro-line-3/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Based on a 54-month deadline starting from the end of 2019. ** See https://www.railwaygazette.com/projects-and-planning/metro-de-panama-awards-line-3-contract/55710.article; some other sources say 25. *** https://www.railjournal.com/passenger/metros/panama-metro-line-3-contract-finally-awarded/ says 2,057 million but is probably a typo given what other sources say. |
||||||