LINE | Name | Country | City | Regional Rail | |||
Line 11 | FR | Paris | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2016 | 2023 | 6.3 | 5.7 | 90%* | 6 | Measured | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
1084.0** | EUR | 1.3 | 2014 | 1409.2 | 223.7 | Plan | |
REFERENCE | https://www.ratp.fr/en/groupe-ratp/metrotrains/m11-extension-rosny-bois-perrier-and-then-noisy-champs | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * Length is exact, but there is a short measured elevated segment. ** Not including 214 million for lengthening stations on the existing line. See also https://www.iledefrance-mobilites.fr/le-reseau/projets/metro-11-prolongement-mairie-des-lilas-rosny-bois-perrier |
||||||