LINE Name Country City Regional Rail
Purple SA Riyadh No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2014 2019 29.9 0.0 0% 6 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3330.0 USD 1.82 2013 6060.6 202.7 Trade
REFERENCE https://www.fastmetroriyadh.com/about/our-lines/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.