LINE | Name | Country | City | Regional Rail | |||
Line C – section T6a | IT | Rome | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2007 | 2013 | 2.8 | 2.8 | 100% | 4 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
399.0 | EUR | 1.3 | 2010 | 518.7 | 185.3 | Plan | |
REFERENCE | https://metrocspa.it/cms/wp-content/uploads/2016/12/2-Q.E.G.-12-set-2013.pdf | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
Go to Rome city page. |