LINE | Name | Country | City | Regional Rail | |||
Line 5 extension | RU | Saint Petersburg | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2013 | 2019 | 6.4 | 6.2 | 97% | 3 | Measured | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
44,600.0* | RUB | 0.04 | 2016 | 2,064.5 | 322.6 | Media | |
REFERENCE | http://krti.gov.spb.ru/press/news/52016/?category=17 | ||||||
NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * 34,000 extension proper, 10,600 for depot expansion for a bigger fleet. |
||||||
Go to Saint Petersburg city page. |