LINE Name Country City Regional Rail
Project 63 CL Santiago No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2013 2019 37.0 37.0 100% 28 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3000.0* USD 1.7 2016 5100.0 137.8 Plan
REFERENCE https://www.metro.cl/files/documentos/metro-investor-201709.pdf
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* The cost figure is from just before Line 6 opened but more than a year before Line 3 opened.
Go to Santiago city page.