LINE Name Country City Regional Rail
Line 6 phase 1 BR Sao Paulo No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2015 2023 15.9 13.4 84% 15 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
9600.0 BRL 0.44 2020* 4224.0 265.7 Trade
REFERENCE https://www.railjournal.com/passenger/metros/revival-of-sao-paulo-metro-line-6-orange-project-a-step-closer/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* Shifted later than the midpoint since only 15% of the project is complete as of 2019.