LINE Name Country City Regional Rail
Sinbundang phase 2 KR Seoul No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2011 2018 12.8 12.8 100% 7 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
1025500.0* KRW 0.0 2006 1333.2 104.2 Plan
REFERENCE https://shinbundang.co.kr/eng/index.jsp?pageID=/eng/intro/intro2_6.jsp&open_main=4&open_sub1=1&open_sub2=6
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* This is the cost across a few different sources, e.g. https://centers.ibs.re.kr/html/living_en/transport/KSP%2011%20Korea%C2%B4s%20Railway%20PPP%20Projects.pdf, but https://www.donga.com/news/article/all/20110216/34857594/1 claims 1.5343 trilion, which could be a 2006 won vs. YOE won difference.
Go to Seoul city page.