LINE | Name | Country | City | Regional Rail | |||
Line 1 | ES | Seville | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2003 | 2009 | 18.2 | 11.6 | 64% | 22 | Measured | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
892.0 | EUR | 1.25 | 2006 | 1115.0 | 61.3 | Media | |
REFERENCE | https://www.diariodesevilla.es/sevilla/construccion-linea-1-Metro-Sevilla_0_1341766366.html | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||