LINE Name Country City Regional Rail
Line 1 ES Seville No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2003 2009 18.2 11.6 64% 22 Measured
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
892.0 EUR 1.25 2006 1115 61.3 Media
REFERENCE https://www.diariodesevilla.es/sevilla/construccion-linea-1-Metro-Sevilla_0_1341766366.html