LINE Name Country City Regional Rail
Line 8 Phase 3 (Pujiang Line) CN Shanghai No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2018 6.69 0.0 0% 6 Media
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
3177.0 CNY 0.26 2015 820.7 122.7 Media
REFERENCE https://zh.wikipedia.org/wiki/%E4%B8%8A%E6%B5%B7%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A%E6%B5%A6%E6%B1%9F%E7%BA%BF#cite_note-4
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Shanghai city page.