LINE | Name | Country | City | Regional Rail | |||
Line 1 Eastern Extension | CN | Shenyang | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2020 | 2025 | 15.0 | 15.0 | 100% | 9 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
10350.0 | CNY | 0.24 | 2019 | 2465.5 | 164.4 | Media | |
REFERENCE | http://www.shenyangbus.com/a/sydt/2018/1227/10268.html; https://3g.163.com/dy/article_cambrian/FBU1V3JE052590Q7.html | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||