LINE Name Country City Regional Rail
Line 1 Eastern Extension CN Shenyang No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2020 2025 15.0 15.0 100% 9 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
10350.0 CNY 0.24 2019 2465.5 164.4 Media
REFERENCE http://www.shenyangbus.com/a/sydt/2018/1227/10268.html; https://3g.163.com/dy/article_cambrian/FBU1V3JE052590Q7.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
Go to Shenyang city page.