LINE Name Country City Regional Rail
Line 2 Southern Extension CN Shenyang No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
14.3 8 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
10170.0 CNY 0.24 2019 2422.6 169.4 Media
REFERENCE http://www.shenyangbus.com/a/sydt/2018/1227/10268.html
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.