LINE Name Country City Regional Rail
Line 3 Phase 1 CN Shenyang No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2025 38.4 28 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
23130.0 CNY 0.24 2019 5509.8 143.5 Media
REFERENCE http://www.janeoo.com/news/hangyedongtai-detail-539834.htm
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.