LINE Name Country City Regional Rail
Underground Project TW Tainan Yes*
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2019 2024 8.2 8.2 100% 3 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
29360.0 TWD 0.07 2021 1949.5 237.7 Plan
REFERENCE https://www.rb.gov.tw/en/showpage.php?lmenuid=24&smenuid=159
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* This is regional rail, but the construction is simplified by use of cut-and-cover. https://www.sucoot.com/product-Tainan-Urban-District-Railway-Underground-Project-C0009-20.html