LINE | Name | Country | City | Regional Rail | |||
Sanying Line | TW | Taipei | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2016 | 2023 | 14.29 | 0.0 | 0% | 12 | Plan | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
50200.0* | TWD | 0.07 | 2019 | 3333.3 | 233.3 | Plan | |
REFERENCE | https://www.dorts.ntpc.gov.tw/home.jsp?id=90&act=be4f48068b2b0031&dataserno=09b73a18932ab2e245b25cd63399a208 | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * See also https://open33.ntpc.gov.tw/loading_sanying. |
||||||