LINE Name Country City Regional Rail
Sanying Line TW Taipei No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2016 2023 14.29 0.0 0% 12 Plan
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
50200.0* TWD 0.07 2019 3333.3 233.3 Plan
REFERENCE https://www.dorts.ntpc.gov.tw/home.jsp?id=90&act=be4f48068b2b0031&dataserno=09b73a18932ab2e245b25cd63399a208
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* See also https://open33.ntpc.gov.tw/loading_sanying.
Go to Taipei city page.