LINE | Name | Country | City | Regional Rail | |||
Yunusabad Line extension | UZ | Tashkent | No | ||||
CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
2017 | 2020 | 2.9 | 2.9 | 100% | 2 | Trade | |
COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
124.8* | USD | 5.0 | 2018 | 624.0 | 215.2 | Trade | |
REFERENCE | https://www.railwaypro.com/wp/tashkent-metro-extension-is-underway/ | ||||||
NOTES | Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. * See also https://www.railtech.com/infrastructure/2019/05/31/tashkent-metro-will-be-extended-with-two-elevated-lines/, expressing the same figure in exchange rate euros. This may include rolling stock, since the Sergeli Line figure does. |
||||||
Go to Tashkent city page. |