LINE Name Country City Regional Rail
Yunusabad Line extension UZ Tashkent No
CONSTRUCTION DETAILS Start year End year Length (in km) Tunnel (in km) Tunnel Stations Source
2017 2020 2.9 2.9 100% 2 Trade
COST INFORMATION Cost (in M) Currency PPP rate Year PPP Real cost (in M$) Cost/km (in M$) Source
124.8* USD 5.0 2018 624.0 215.2 Trade
REFERENCE https://www.railwaypro.com/wp/tashkent-metro-extension-is-underway/
NOTES Sections of the line constructed in trench are represented with the same line style as the at-grade sections.
The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project.
* See also https://www.railtech.com/infrastructure/2019/05/31/tashkent-metro-will-be-extended-with-two-elevated-lines/, expressing the same figure in exchange rate euros. This may include rolling stock, since the Sergeli Line figure does.